S9040-AA-IDX-010 Expanded Ship Work Breakdown Structure – Spreadsheet

Published: Unknown

This is a spreadsheet (MS Excel) format Expanded Ship Work breakdown Structure (ESWBS) guide. The spreadsheet does not reference a particular version of S9040-AA-IDX-010 as it’s basis. However, this spreadsheet format is extremely useful for tailoring an ESWBS for a given ship acquisition program.

The Ship Work Breakdown Structure (SWBS) was an indenturing language which was to be used throughout the entire ship life cycle, from early design cost studies and weight analyses, through production and logistic support development, to operational phases, including maintenance, alteration and modernization. The Expanded SWBS (ESWBS) is an extension of the three digit SWBS system which satisfies the original intent of the SWBS numbering system by refining the SWBS system descriptions, definitions and boundaries through a structured increase in the levels of indenture. This expansion retains the patterns of the Ship Work Authorization Boundary (SWAB) numbers, while combining the SWBS and SWAB systems into one controlled, consistent language which suits the needs of all users.

Download
Scroll to Top